Financial cluster · engine-measured

IPMT in Excel

IPMT returns the interest portion of one specific loan payment. On a $250,000 30-year mortgage at 6.5%, payment 1 is $1,354.17 interest — 85.70% of the whole payment — while payment 360 is only $8.51.

By LookupLab Editorial · Published and last verified 2026-11-24 · every figure below computed with HyperFormula 3.5

Syntax

IPMT(rate, per, nper, pv, [fv], [type])
ArgumentWhat it means
rateRate per period.
perWhich payment to inspect. The documented valid range is 1 to nper.
nperTotal number of payments.
pvLoan principal, positive when you receive the money.
fvOptional residual balance, default 0.
type0 = period end, 1 = period start.

Measured examples

Each result was returned by the engine, not written by hand. Loan fixture: $250,000, 6.5% a year, 360 monthly payments.

FormulaResultReading
=IPMT(0.065/12,1,360,250000)-1,354.17Payment 1: almost all interest
=IPMT(0.065/12,180,360,250000)-985.79Payment 180: the halfway point
=IPMT(0.065/12,360,360,250000)-8.51Final payment: interest nearly gone
=IPMT(0.065/12,1,360,250000)+PPMT(0.065/12,1,360,250000)-1,580.17Equals PMT exactly — the amortisation identity

The measured amortisation crossover

Interest does not fall linearly. Measured share of each payment going to interest: 85.70% at payment 1, 62.39% at payment 180, and 0.54% at payment 360. Halfway through a 30-year mortgage you are still paying mostly interest, which is why early extra payments save far more than late ones. The identity IPMT + PPMT = PMT holds to the cent: -1,354.17 + -226.00 = -1,580.17.

How the first payment's interest scales with rate

Interest in payment 1 is simply one month's charge on the full balance, so it moves in lockstep with the rate: $1,145.83 at 5.5%, $1,562.50 at 7.5%. Nothing about the amortisation schedule cushions it.

Annual rateFormulaMeasured result
5.5%=IPMT(0.055/12,1,360,250000)$1,145.83
6.5%=IPMT(0.065/12,1,360,250000)$1,354.17
7.5%=IPMT(0.075/12,1,360,250000)$1,562.50

All other inputs held constant. Measured, not modelled.

Engine caveat

Measured engine caveat: the documented range for per is 1 to nper, but this engine returns -1,355.38 for per=0 and 0 for per=361 instead of raising an error. Do not treat a returned number as proof that per was valid.

Where IPMT sits in the financial cluster

IPMT and PPMT split the payment from PMT into its two parts. Discount the whole stream with PV.

Common questions

Why is my first payment almost all interest?

Because interest is charged on the full outstanding balance. Measured: 85.70% of payment 1 is interest on this loan, falling to 0.54% by payment 360.

Do IPMT and PPMT add up to PMT?

Yes, exactly. Measured on payment 1: -1,354.17 + -226.00 = -1,580.17, which is PMT.

What happens if per is out of range?

The documented range is 1..nper. This engine still returns a value for per=0 (-1,355.38) and 0 for per=361, so validate per yourself rather than relying on an error.

Does IPMT account for extra payments I have made?

No. IPMT computes interest from the scheduled balance implied by rate, nper and pv. After a prepayment, recompute against the actual remaining principal or your interest figure will be too high.

Used in practice: Excel for finance & accounting