PV tells you what a future stream of payments is worth today at a given discount rate. A 30-year $1,580.17/month mortgage at 6.5% discounts back to $249,999.99 — measured below.
| Argument | What it means |
|---|---|
| rate | Discount rate per period; 0.065/12 for monthly at 6.5% a year. |
| nper | Number of payments. |
| pmt | Payment per period, negative for money you pay out. |
| fv | Optional balance remaining after the last payment. Defaults to 0. |
| type | 0 = payment at period end (default), 1 = period start. |
Each result was returned by the engine, not written by hand. Loan fixture: $250,000, 6.5% a year, 360 monthly payments.
| Formula | Result | Reading |
|---|---|---|
| =PV(0.065/12,360,-1580.17) | 249,999.99 | Rounds back to the $250,000 loan — off by one cent |
| =PV(0.05/12,60,-500) | 26,495.35 | What a 5-year $500/month car loan borrows at 5% |
| =PV(0.05/12,60,-500,0,1) | 26,605.75 | Same loan, payments at period start |
| =PV(0.08,10,0,-100000) | 46,319.35 | A single $100,000 received in 10 years, discounted at 8% |
| =PV(0.065/12,360,0) | 0.00 | No payment and no fv returns 0 |
The exact payment on this loan is -1580.1700587. Feed the rounded $1,580.17 into PV and you get $249,999.99, not $250,000.00. The missing cent is 360 months of compounding on the truncated fraction. When you reconcile a loan schedule, carry the full-precision PMT — nest it, as in =PV(0.065/12,360,PMT(0.065/12,360,250000)) — instead of retyping a rounded number.
Hold the payment at $1,580.17 for 360 months and vary only the rate. At 5.5% that payment supports $278,302.33 of borrowing; at 7.5% only $225,992.16. A single point of rate moves your budget by roughly fifty thousand dollars.
| Annual rate | Formula | Measured result |
|---|---|---|
| 5.5% | =PV(0.055/12,360,-1580.17) | $278,302.33 |
| 6.5% | =PV(0.065/12,360,-1580.17) | $249,999.99 |
| 7.5% | =PV(0.075/12,360,-1580.17) | $225,992.16 |
All other inputs held constant. Measured, not modelled.
PV inverts FV and consumes the payment from PMT. To split any payment into interest and principal, see IPMT and PPMT.
Because pmt was positive. Excel's cash-flow sign convention makes money out negative; enter -500 to receive a positive present value.
Yes. Set pmt to 0 and put the future amount in fv. Measured: =PV(0.08,10,0,-100000) returns 46,319.35.
You rounded PMT before passing it in. The exact payment is -1580.1700587; the rounded 1580.17 discounts to 249,999.99. Nest PMT inside PV to keep full precision.
No. PV assumes equal payments at a constant rate. NPV takes a series of cash flows that may differ in size, which is what you want for an irregular project or rental stream.